How We Build a Concrete Garden Room Base in St Austell
A garden room is only as good as the slab it sits on. On this recent job in St Austell we built a 100mm concrete base on 100mm of compacted MOT Type 3 and a damp-proof membrane, with a row of concrete blocks laid flat along the fence line as a low retaining edge.
Below is exactly how we did it, step by step, including how we got the base dead square before a drop of concrete went in. If you’re planning a garden room, summerhouse or workshop anywhere in Cornwall, this is what a properly built base should look like.
The spec at a glance
Every layer has a job, and skipping one is where most DIY bases fail.
|
Layer |
Spec |
What it does |
|---|---|---|
|
Retaining edge |
Concrete blocks laid flat on a mortar bed |
Holds back the bed behind the fence and forms one side of the slab |
|
Sub-base |
100mm MOT Type 3, compacted |
Firm, free-draining platform that won’t settle |
|
Damp-proof membrane |
1200 gauge polythene, lapped 300mm |
Stops ground moisture rising into the slab |
|
Slab |
100mm concrete, 1:5 cement to all-in ballast |
The structural base the garden room sits on |
|
Formwork |
Treated timber, pegged and screwed |
Sets the edges, level and finished height |
Step by step: how we built it
1. Mark out and dig
We marked the footprint about 100mm bigger all round than the garden room itself, then lifted the turf and topsoil. We dug down to firm subsoil, allowing roughly 200mm for the sub-base and slab, adjusted so the finished slab sits just proud of the surrounding lawn. Any soft spots were dug out and filled with hardcore.
2. Build the block retaining edge
Along the fence side the ground was higher, so we laid concrete blocks flat on a mortar bed to retain the planted bed behind. Each block was set to a string line and checked with a spirit level so its top matched the finished slab height. Once the mortar went off, the blocks became a permanent edge for the slab on that side, so no timber shutter was needed there.
3. Set up the formwork
On the three open sides we fixed treated timber boards to stakes driven outside the frame, with screws rather than nails so they can be adjusted. The top edge of the timber is the finished slab level, so we got every board level with a long spirit level before moving on. For a garden room the base needs to be level, not falling, so the building sits true.
4. Square the frame
A base that’s out of square means a garden room that won’t sit right on it, so we check this twice.
- 3-4-5 check on a corner. Measure 3 units along one side and 4 along the other, then measure between those two marks. If it reads 5, the corner is 90 degrees. On a base this size we scale it up, for example 1.2m, 1.6m and 2.0m, or 1.8m, 2.4m and 3.0m.
- Diagonal check across the frame. Measure corner to corner both ways. If both diagonals read the same, the frame is square. If not, push the long diagonal in slightly and re-measure until they match, ideally within 2 to 3mm.
- Re-check level. Squaring can knock boards out, so level is checked again before the stakes are fully tightened.
5. Lay and compact the MOT Type 3
We spread 100mm of MOT Type 3 inside the frame and compacted it with a plate compactor in passes until it was firm underfoot. Type 3 has fewer fines than Type 1, so it drains freely and stops water sitting under the slab. A thin blinding of sharp sand can go over the top to protect the membrane from sharp stones.
6. Lay the damp-proof membrane
We rolled out 1200 gauge polythene over the sub-base, lapping every joint by at least 300mm and taping the laps. The membrane runs up the inside of the formwork and the block edge so moisture can’t track in round the sides. Any punctures get patched before the pour.
7. Mix and pour the concrete
We mixed the concrete on site in a mixer at 1 part cement to 5 parts all-in ballast, keeping the water down so the mix was workable but not sloppy. Too much water weakens concrete and causes cracking. We worked from the far side towards the access, barrowing in a section at a time and spreading it just above the top of the formwork so there was enough to tamp down.
8. Tamp and finish
With a straight timber tamping beam resting on the formwork, we worked across the slab in a sawing, chopping motion. This compacts the concrete, knocks out air and brings it down to the level of the boards. Low spots were topped up and tamped again. We finished the edges with a trowel and left a light tamped texture on top, which gives a good key for the garden room’s bearers.
9. Cure and protect
Concrete gains strength by curing slowly, not drying fast. We covered the slab with polythene to keep moisture in and protect it from rain, sun and frost. Typical timings:
|
Stage |
Time after pour |
|---|---|
|
Light foot traffic |
24 to 48 hours |
|
Strike formwork |
2 to 3 days |
|
Build the garden room on it |
About 7 days |
|
Full strength |
28 days |
|
Photo |
Place after |
Caption |
Alt text |
|---|---|---|---|
|
Dug out, block edge and timber formwork on bare sub-base |
Step 3 |
Formwork set level and block retaining edge in place along the fence |
Garden room base excavation with timber formwork and concrete block edge, St Austell |
|
Tape measure across the diagonal over the DPM |
Step 4 |
Checking the diagonals to get the frame dead square |
Squaring concrete slab formwork by measuring diagonals, Cornwall |
|
Mixer, barrow and first sections poured on the DPM |
Step 7 |
Site-mixed concrete going in over the damp-proof membrane |
Pouring concrete garden room base over DPM, St Austell |
|
Finished tamped slab against the fence |
Step 8 |
Tamped and finished, ready to cure |
Finished 100mm concrete garden room slab, St Austell, Cornwall |
Common questions
How thick should a garden room base be? 100mm of concrete on 100mm of compacted sub-base suits most timber garden rooms and summerhouses. Heavier buildings or soft ground may need more.
Do I need a damp-proof membrane under a garden room slab? Yes. Without one, ground moisture wicks up through the concrete and into the floor of the building.
Why MOT Type 3 instead of Type 1? Type 3 is free-draining, so water doesn’t sit under the slab. Type 1 compacts tighter but holds more water.
How long before I can put the garden room on it? Allow about a week for a lightweight timber building. The slab keeps gaining strength for 28 days.
Need a garden room base in Cornwall?
Build Maintain lays concrete bases for garden rooms, summerhouses, sheds and workshops across St Austell and mid Cornwall. Every base is squared, levelled and built on a proper sub-base and membrane, as above.
For a free quote, call 07730 898992, email hello@buildmaintain.co.uk or visit buildmaintain.co.uk
📞 07730 898992. 📧 hello@buildmaintain.co.uk











